Sweden's first ZOE fast chargers on the E22 motorway near Ronneby run two 180 kW chargers, each with a dedicated 218 kWh battery unit, from an existing 63-ampere grid feed with no network upgrade. The project received 50% co-financing via Klimatklivet.
Highlights
- Two 180 kW chargers, 360 kW combined
- Each paired with a 218 kWh battery
- Runs on a 63-ampere grid feed
- No grid upgrade required; 50% co-funded