EV charging infrastructure market (2026): 93.57 USD bn  ·  EV charging infrastructure market (2030): 249.87 USD bn

Overview

The Braintree Electric Forecourt pairs a large on-site battery (about 6 MWh) with solar canopies and dozens of high-power chargers, buffering the grid and cutting demand charges while serving highway traffic.

Highlights

  • About 6 MWh on-site battery storage
  • 36 high-power chargers
  • Solar canopies
  • Designed for highway-corridor traffic

Source: Gridserve